User contributions for [email protected]
11 July 2023
- 19:0219:02, 11 July 2023 diff hist −18 Cavitation No edit summary current
- 19:0219:02, 11 July 2023 diff hist −18 Spillway Terminal Structure Hydraulics No edit summary
- 19:0119:01, 11 July 2023 diff hist −36 Spillway Chute Hydraulics No edit summary
- 18:2718:27, 11 July 2023 diff hist −48 Spillway Control Structures No edit summary
- 18:2218:22, 11 July 2023 diff hist −6 Ogee-Crested Weirs No edit summary
- 18:2118:21, 11 July 2023 diff hist 0 Earth-Cut/Vegetated Spillways No edit summary current
- 18:2118:21, 11 July 2023 diff hist +18 Sharp-Crested Weirs No edit summary current
- 18:1818:18, 11 July 2023 diff hist −6 Anatomy of Dams No edit summary
- 17:4917:49, 11 July 2023 diff hist +2,367 N Soil/Rock Permeability Characterization Created page with "__NOTOC__ Category:Seepage Analysis ---- Horizontal and vertical permeability are crucial properties to consider when evaluating the effectiveness and safety of soil or rock materials used in the construction of dams. Permeability characteristics of the soil or rock layers play a significant role in determining the stability, seepage behavior, and overall performance of a dam. Horizontal permeability refers to the ease with which water can flow parallel to..."
- 17:2217:22, 11 July 2023 diff hist −12 Tailings Dams No edit summary
- 17:2117:21, 11 July 2023 diff hist −6 Timber Dams No edit summary
- 17:1417:14, 11 July 2023 diff hist −24 Emergency Action Planning No edit summary current
- 17:0817:08, 11 July 2023 diff hist −18 Movement Surveillance & Monitoring No edit summary current
- 17:0617:06, 11 July 2023 diff hist −12 Decommissioning No edit summary
- 16:5216:52, 11 July 2023 diff hist −48 Reservoir Routing No edit summary current
- 16:5116:51, 11 July 2023 diff hist −18 Spillway Approach Hydraulics No edit summary
- 16:5016:50, 11 July 2023 diff hist −42 Spillways No edit summary
- 16:4816:48, 11 July 2023 diff hist −6 O&M of Gates/Bulkheads No edit summary current
- 16:4816:48, 11 July 2023 diff hist −12 Design and Construction of Gates/Bulkheads No edit summary current
- 16:4716:47, 11 July 2023 diff hist −18 Gates/Bulkheads No edit summary
- 16:4616:46, 11 July 2023 diff hist −6 Decommissioning of Outlet Works No edit summary current
- 16:4516:45, 11 July 2023 diff hist +22 O&M of Outlet Works No edit summary
- 16:4316:43, 11 July 2023 diff hist −66 Design and Construction of Outlet Works No edit summary
- 16:4216:42, 11 July 2023 diff hist −24 Outlet Works No edit summary
- 16:4016:40, 11 July 2023 diff hist +18 Flumes No edit summary current
- 16:0516:05, 11 July 2023 diff hist −12 Inspections No edit summary
- 16:0416:04, 11 July 2023 diff hist −6 Site Access No edit summary
- 16:0316:03, 11 July 2023 diff hist −24 Repairing Concrete No edit summary current
- 16:0216:02, 11 July 2023 diff hist −6 Controlling Animal Activity No edit summary
- 16:0016:00, 11 July 2023 diff hist −6 Vegetation Management No edit summary
- 15:5915:59, 11 July 2023 diff hist −78 Geotechnical and Geology No edit summary
- 15:5615:56, 11 July 2023 diff hist −18 Geologic History No edit summary current
- 15:5015:50, 11 July 2023 diff hist −30 Seismic No edit summary
- 15:3815:38, 11 July 2023 diff hist −18 Borrow Investigation No edit summary
- 15:3715:37, 11 July 2023 diff hist −6 Static Deformation No edit summary current
- 15:1615:16, 11 July 2023 diff hist −24 Slope Stability No edit summary
- 15:1415:14, 11 July 2023 diff hist −18 Drain Sizing No edit summary current
- 15:1415:14, 11 July 2023 diff hist −24 Filter Design No edit summary
- 15:1215:12, 11 July 2023 diff hist −18 Seepage Analysis No edit summary
- 15:1015:10, 11 July 2023 diff hist −54 Seepage Analysis & Filter/Drain Design No edit summary
- 14:5714:57, 11 July 2023 diff hist −36 Foundation Evaluation No edit summary current
- 14:4414:44, 11 July 2023 diff hist −18 Sedimentation No edit summary current
10 July 2023
- 23:1923:19, 10 July 2023 diff hist +2,954 N Accuracy Requirements for Surveys Created page with "__NOTOC__ Category:Movement Survey ---- Accurate surveys are crucial in dam engineering to gather precise and reliable data about the dam and its surrounding areas. As such, the accuracy requirements for these surveys are stringent, as even small errors in measurements can have significant implications for dam design, analysis, and safety. The following are some of the commonly used accuracy requirements for surveys related to dams: 1. Geodetic Control: Geod..."
- 23:1123:11, 10 July 2023 diff hist −18 Survey No edit summary
- 23:1023:10, 10 July 2023 diff hist −6 Monuments No edit summary
- 23:0923:09, 10 July 2023 diff hist −18 Settlement No edit summary current
- 23:0823:08, 10 July 2023 diff hist −6 Lining No edit summary
- 23:0623:06, 10 July 2023 diff hist −12 Grouting No edit summary
- 23:0523:05, 10 July 2023 diff hist −12 Cutoff No edit summary
- 23:0423:04, 10 July 2023 diff hist −12 Relief Wells No edit summary